Yearly Maintenance Of Storm Drainage System By Suction And Water Jetting Pump Within Action Area I, Ii And Iii
Yearly Maintenance Of Storm Drainage System By Suction And Water Jetting Pump Within Action Area I, Ii And Iii
Supply of 2 Portable Dg Set High Pressure Water Jetting Cleaning Pump Set
Hiring Of 01 No. Mini Jetting Cum Section Machine Mounted On Mahindra Bolero Maxi Cng With 1500 Liters Water Tank, Standard Jetting Pump Including Driver Cum Operator And 02 Nos. Labour Maintenance Of Sewer System Fo Narrow Lanes Working Shift
Cutting And Removal Of Joist, Tough Plates From Under Water At Depth Ranging From 3.0M To 4.0M Of 7.0M Diameter Well Without Disturbing Existing Well Concrete With Specialized Driver Team Under Water Cutting Rod, Jetting Pump Diving Compressor, Oxygen
Yearly Maintenance Of Storm Drainage System By Suction And Water Jetting Pump Within Action Area - I, Ii And Iii Under Nkda During The Fy 2023-24.
Cutting And Removal Of Joist Tough Plates From Under Water At Depth Ranging From 3.0M To 4.0M Of 7.0M Diameter Well Without Disturbing Existing Well Concrete With Specialized Driver Team Under Water Cutting Rod, Jetting Pump Diving Compressor, Oxygen C