Maintenance And Repair Of Flowmeters And Analyzers At Barshi Kurduwadi And Chandni Water Supply Schemes, Sewage Treatment Plants In Barshi.
Construction Of Prds Rural Piped Water Supply Schemes Har G Har Nal Jal Schemes That Has Been Taken Over By Phed, For Sat Uration Of Uncovered Habitation Having 45440 Household Under Blockkanti & Sahebganj, Marwan, Paroo, Saraiya, Meenapur, Kudhani, Motipur Districtmuzaffarpur With Chlorination Unit & Storage On 8 Mtr. Steel Staging Under ? Mukhya Mantri Gramin Payjal Nishchay Yojna? For The Year 2025 -2026 Under P.H.Division Motipur.
Design, Construction, Supply Of Materials, Testing And Commissioning Of Piped Water Supply Schemes Ward Level Schemes For Habitations Left Out Under ?Har Ghar Nal Ka Jal? Nischay Yojna In Panchayats Where ?Har Ghar Nal Ka Jal? Was Executed By The ? Panchayati Raj Department? With Electric Driven Pumps In The District Of Sheohar, Bihar On Turn-Key Basis With 3 Months Trial Run Period. Under P H Division
Design, Construction, Supply Of Materials, Testing And Commissioning Of Piped Water Supply Schemes Ward Level Schemes For Habitations Left Out Under ? Har Ghar Nal Ka Jal? Nischayyojna In Panchayats Where ? Har Ghar Nal Ka Jal? Was Executed By The ? Panchayati Raj Department? With Electric Driven Pumps In The District Of Darbhnaga, B Ihar On Turnkey Basis With 3 Months Trial Run Period Under Block Bahadurpur / Hanum Amnnagar / Hayaghat / Jale / Keoti / Singhwara P.H. Division, D Arbhnaga
Design, Construction, Supply Of Materials, Testing And Commissioning Of Piped Water Supply Schemes Ward Level Schemes For Habitations Left Out Under ? Har Ghar Nal Ka Jal? Nischayyojna In Panchayats Where ? Har Ghar Nal Ka Jal? Was Executed By The ? Panchayati Raj Department? With Electric Driven Pumps In The District Of Darbhnaga, B Ihar On Turnkey Basis With 3 Months Trial Run Period Under Block Alinagar/ Kusheshwa Rsthan East / Baheri Benipur / Biraul / Gaurabauram / Ghansh Yampur / Kiratpur / Kusheshwarsthan / Tardih / Darbhanga Sada R / Manigachi P.H. Division, Darbhnaga.
Oandm - Water Supply Schemes-Annual Maintenance 2025-26-Cwss To Cheekode And Adjoining Villages - Leak Rectification Work In Pumping Main And Distribution In Pulikkal And Pallikkal Panchyaths Under P.H.Section, Kondotty
Oandm - Water Supply Schemes-Annual Maintenance 2025-26-Cwss To Cheekode And Adjoining Villages-Leak Rectification Works In Pumping Main And Distribution In Cherukavu And Chelembra Under Ph Section, Kondotty
Oandm - Water Supply Schemes- Annual Maintenance-2025-2026- Leak Rectification Work Of Mwss To Panakkad And Melmuri Villages In Malappuram
O And M Water Supply Schemes 2025 26 Wss To Tripunithura M And Adjoining Panchayath Pipeline Work Amc Of Wss To Tripunithura Thiruvankulam Zone Periodical Repair Works And Valve Operating Duty To Water Supply System To Thiruvankulam Zone O And M Water Supply Schemes 2025 26 Wss To Tripunithura M And Adjoining Panchayath Pipeline Work Amc Of Wss To Tripunithura Thiruvankulam Zone Periodical Repair Works And Valve Operating Duty To Water Supply System To Thiruvankulam Zone In Trip
State Plan 2025 26 Rehabilitation Improvement Works Of Urban Water Supply Schemes Replacing Old Filter Media Of Filter Bed No Iv Of Wtp Chavasseryparamb General Civil Work