Panjal Gp 2025-26 Digging Bore Well And Fixing Motor Pump Set At Fhc
Sinking Of Tube Well Using Maya Pump Near Baby Barman Land Under Laskarpur
Sinking Of Submersible Pump Tube Well Without Structure Near Nirmal Auliya Land Laskarpur
Sinking Of Tube Well Using Maya Pump Near Subhas Joddar Land Under Herobhanga
Construction Of Percolation Well With 3Hp Motor Pump For Lifting Water In Village Tilbhitha Under Block Pathna Dist.-Sahibganj
Supply Of Spare Parts Of Deep Well Hand Pump India Mark-Ii Conforming To I.S 9301-1990 With Latest Amendment May Be Read Along With Ist Amendment Is 15500Part 1-7 2004 With Latest Amendment For Spares Of India Mark-Ii Dws Div. Deoghar For 2025-26
Dm Water Initial Filling Line In Boiler 6 And 7 At Hot Well Pump 1 And 4 In Energy Mechanical
Reboring Work Including The Supply Of Motor Pump Of Tube Well Number-22 Already Installed Near The Pond In Mohalla Azizganj.
Site Development Works, 11S Synthetic Football Turf, Pavilion Building, Sump, Pump Room And Open Well, Septic Tank- 50 Users 2 Nos, Security Cabin, Electrification Works For Security Cabin And Pavilion Building, Flood Lighting And Fire Protection Kiifb-Construction Of Municipal Stadium At Adoor, Pathanamthitta
Ground Development Work, Fencing, Electric Pole Foundation, Gate, Toilet Cum Change Room, Long Jump Pit, Drain, Borewell, Inauguration Stone, Name Board, Flood Lighting For The Mud Football Court, Toilet Cum Change Electrification And Bore Well Pump One Panchayath One Playground- Thrissur-Development Of Kadavalloor Grama Panchayath Playground In Kunnamkulam Lac, Thrissur