Widening From Single Lane To Intermediate Lane And Strengthening At Km 0 0 4 8 Of Arumanai Panachamoodu Road Tnv-98 Tnv 98 Kuzhithurai H C M Sub Division
Lane Widening And Strengthening With Paved Shoulder Of Ajgain-malihabad-itaunja Road Sh-115 Ch. 29.095 To 37.900
Widening Of Existing Single Lane To Double Lane Road Pwd Road To Sna Via Shanthapur, Dhadgi Road From Km 0/0 To 11/4 In Kamareddy District
Construction Of Exi. Four Track Asphalt Road & Widening To Six Lane And Strengthening From Oshwalcentre Pilot Bunglowkhodiyar Colony To Digjam Circle
Widening From Single Lane To Intermediate Lane And Strengthening At Km 0.0 3.2 Of Acharapakkam Anakunnam Road Including Reconstruction Of Box Culvert At Km 0.8 Tn.61/Sl.No.01/Cpt/Cridp Work 2025-26
Widening From Two Lane To Four Lane Of Km.25/4 - 26/8 Of Nagapattinam - Gudalur - Mysore Road Including Widening Of Culverts Tnj103
Widening From Single Lane To Intermediate Lane And Strengthening At Km 3.0 5.650 Of Pillaichathram Maduramangalam Road Via Ramanujapuram Road Including Reconstruction Of Box Culvert At Km 3.6 3.8 5.2 And 5.4 Tn.61/Sl.No.03/Kpm/Cridp Work 2025-26
Widening Of Existing Single Lane To Intermediate Lane, Extension Of Cd Work, Providing And Laying Metalling/tarring, Side Drain And Parapets Etc. Between Km. 46/0 To 48/0. Restoration Of Dehra Jawali Road Km. 39/180 To 79/600.
Consultancy Services For Preparation Of Detailed Project Report For Widening To Four Lane With Paved Shoulder From Two Lane From Km.272.964 Anchatgiri To Km.287.463 Dharwad Cross And From Km.294.218 Kalghatagi To Km.300.00 Devikoppa Of Nh-52 In The
Widening From Four Lane To Six Lane And Strengthening From Km 1 300 2 275 Of Sardar Patel Road Including Formation Of Slip Roads Reconstruction Of Drain Cum Footpath And Compound Wall Including Land Alienation As Phase 1B Tn.60/Sl.No.02/Ccr-I/Special Infrastructure Improvement Programme For Chennai City 2025-2026