Work Of Provision Of Men Power & Tractor Trolley With Fork Lift (diesel) For Material Movement From Store Depot To Workshop (judw)=3392 Trips & Internal Material Movement Of Workshop & Loading Of Railway Material On Trolla & Bfr/brn Wagon At General Store & Unloading By Crane At Workshop (judw) For A Period Of 300 Working Days At N.rly Jagadhri Workshop.
Requirement Of Fabrication Material For Mechanical Workshop Bhagwati Nagar Jmc
Operation And Maintenance Of 04 Nos. Sewage Treatment Plant Of 100 Kld And 01 No. Sewage Treatment Plant Of 08 Kld With Material At Carriage Workshop, Alambagh, Lucknow
Supply Of Workshop Material For The Dept. Of Instrumentation And Usic, Gauhati University
Supply Of Workshop/line Material As And When Required During Financial Year 2025-26 Or Till Next Contract Gets Finalized
Supply Of Sliding Gates For Main Entry & Workshop Side Material Gate With Installation & Fitting As Per Annexure-a Copy Attached.
Maintenance Of Various Equipment Of Cpoh Workshop With Railway Material By Providing 02 Nos. Of Skilled And 04 Nos. Of Unskilled Workman With Tools Required For Job And Materials If Required As Per Detail Given In Schedule Of Work For Two Years.
Supply Of Sliding Gates For Main Entry & Workshop Side Material Gate With Installation & Fitting As Per Annexure-a Copy Attached.
Annual Maintenance Of Workshop Machine And Material Handling In Stores For The Year 2025 26
Gem bids for Custom Bid For Services - Kota - Hiring Of One Number Openbody19 Feet Lcv Truck On Monthly Basis For Movement Ofc&W Material From Kota Workshop, Crws/Bpl, Aiiw, Juworkshop And Any Depot Of Indian Railways For Two Year /