Rough Cost Estimate For Replacement Of Damaged Water Supply Ac Pipeline With Di Pipeline From Rmc Point Towards Ind. Area Phase-7/8 Light Point And Laying Of Water Supply Line For Connecting Canal Water To Newly Proposed Booster In Ind. Area Phase-8