Gem Bids For 326 Construction Of A Hard Standing And An Assembly Shed Clearing Jungle Including Uprooting Of Rank Vegetation Grass Brushwood Earth Work In Excavation By Manual Means Over Area Caste In Situ Concrete Work Of Nominal Mix Concrete Cast In Suit Plum Concrete Work Of Nominal Mix Concrete M10 Centering And Shuttering Incliding Strutting Propping Etc And Removal Of Foms For Foundation Hard Packed Stone Filling Under Floor In Horizontal Layer Providing And Laying Cement Concrete Mix Over Stone Filling Plinth Protection 50mm Thick Of Cement Concreate 15mm Cement Plaster On The Rough Side Of Single Of Half Brick Wall Of Mix Distempering With Oil Bound Washable Distemper Of Approved Brand And Manufacture Electricity Point Flag Pole Bottom Post And Painting Work Complete