Construction Of Link Road From Khotang To Grama (up To Khotang) Km. 0/00 To 4/660 (sh:-c/o R/wall In G.i Wire Crate At Rd 2/200 To 2/212, 2/240 To 2/254.20 And In Pcc 1:3:6 At Rd 2/460 To 2/498)