Erection Of Temporary Pandal And Platform For Block-I, Block-Ii, Diplomat, Ec Block, Reserve Block, Block-C, Police Control Tower, Anti-Chamber, Electrical Room, S.B. Room, P.W.D. Room, I And Ca Room And Fixing Of Departmental Pipe Railing Along Red