Kay - Proposed Yard Remodelling Work For Increasing The Csl Of Rd.1 & 2 To 715M Each With Single Face Hl Pf For Rd.2 For About 600 Mts. Platform Work & Provision Of Precast Rcc Interlocked U Shaped Side Drain For A Length Of 715M