The Work Includes Formation Of Road Of 70 M With Dry Rubble Masonry Wall For Foundation And Super Structure Over Coconut Piles. Mla Ads 2022-23 Vypin Lac -Side Protection Work At Veerapanchira Road First Phase In Ward 22 Of Pallippuram Grama Panchayath