Widening And Strengthening Of Stretch From Hansdihadesign Ch 92.380 Kmto Chopamoredesign Km 129.370Of Nh-133 To 4Lane With Paved Shoulder In The State Of Jharkhand. On Epc Mode For The Fy 2025-26
Setting Up Of Municipal Solid Waste Msw To Energy Facility At Ghazipur Dumpsite
Construction Of Road From Km 87.130 To Km 121.541 Of Taliha-Tato Section Of Nh-913 Frontier Highway To Intermediate Lane On Epc Mode In The State Of Arunachal Pradesh
Construction Of Road From Km 0.00 To Km 27.430 Package-1 Of Bile- Migging Section Km 0.00 At Bile Of Nh-913 Frontier Highway To Intermediate Lane On Epc Mode In The State Of Arunachal Pradesh
Lot-2A Electro-Mechanical Works Except Gsu, Gis, Xlpe And Switchyard Equipment Of 260 Mw 2X130mw Dulhasti Stage-Ii H.E Project, Kishtwar District Of Ut Of J And K, India
Construction Of Road From Km 0.000 To Km 17.812 Package-3 Of Bile- Migging Section Km 0.00 At Migging End Of Nh-913 Frontier Highway To Intermediate Lane On Epc Mode In The State Of Arunachal Pradesh
Construction Of Road From Km 168.000 To Km 183.400 Of Lada-Sarli Section Of Nh-913 Frontier Highway To Intermediate Lane On Epc Mode In The State Of Arunachal Pradesh
Construction Of Road From Km 0.000 To Km 35.580 Of Kharsang-Miao- Vijaynagar Of Nh-913 Frontier Highway To Intermediate Lane On Epc Mode In The State Of Arunachal Pradesh
Pandharpur Municipal Council Underground Sewerage System For Pandharpur City Phase Iv At Tal Pandharpur Dist. Solapur
Rehabilitation And Upgradation For Kopargaon To Savli Vihir Section From Km. 354.000 To Km.362.663 Total Length 8.663 Of Nh 752 G To 4L.Ps In The State Of Maharashtra. Repairs Of Bad Patches And Diversions At The Risk And Cost Of The Contractor As P