Earth Work In Clearance Of Bariyar Drain From Km. 8.700 To 11.200
Repair Of Wing Wall, Approach Road And Protection Work On Bambaghat Bridge At Jogiya Link Road Km-1 Year 2025-26
Construction Of Rcc Drain On The Right Side Of The Bahraich-balrampur Road, From Jagatjit Inter College To Beyond The Block Office.
Under The Sewer And Drainage Scheme, Construction Of An Rcc Drain Is Underway On One Side Of The Road From Khalwa Bazaar To Bodhi Rapti River In Ward No. 7, Rupnagar.
Construction Of 3x18.00 Mtr Span Rcc Small Bridge At Govindpur Semgarha Link Road Km 04 On Bariyar Nala Year 2025-26
Earth Work In Clearance Of Bariyar Drain From Km. 0.000 To 8.500
Construction Of 3x18.00 Mtr Span Rcc Small Bridge At Block Ekauna Ke Gram Sabha In Mujhaniya On Purani Rapti Nale Year 2025-26
Gem Bids For Interactive Panels With Cpu Q2, Video Conferencingcamera / Web Camera V2 Q2, Electronic Lectern Q2
Construction Of Bahraich Bhinga Road Bhakla Nadi Setu To Vaibhi Baidaura Link Road Ch.0.000 To Ch.5.000 Km. Under Rajya Sadak Nidhi Yojna Year 2025-26 Including 05 Years Maintenance
Widening And Strengthening Of Bahraich Kakardari Road Km. 13.00 To 42.00 In Width 7 Meter To 10 Meter Under Rajy Yojna Year 2025-26 05 Years Maintenance