Inspection And Cleaning Of Boiler Drum And Overhauling Of Safety Valves
Mtps I Bm Unit Iv Boiler Pressure Parts Aoh 2025 Maintenance Of Boiler Drum And All Safety Valves And Allied Works
Nctps I Se Mi Circle Aoh Coh 25 26 Bm Dn Unit Ii Conducting Tube Thickness Survey And Repair Work In 1St Pass Inter Pass Overhauling Of Ignitor Scanner Air Fan System Boiler Drum Overhauling And Renewal Of Defective Tubes Nctps I Se Mi Circle Boiler Maintenance Division Annual Overhaul Work For The Year 25 26 Specification No 150 25 26
Overhauling Of Main Boiler Viz Drum, Deaerator, Ibd/cbd Tanks, Replacement Of Coal Nozzle Assembly And Fi Elbows, Repair Of Duct And Dampers Etc Of Unit No.03 Of 3x210 M.w., Atps, Anpara
Nctps I Se Mi Circle Aoh 25 26 Bm Dn Unit Ii Complete Removal Of Worn Out Damaged Insulation In Boiler Drum Down Comer Pipe Line 6 Nos Ring Header Areas During Annual Capital Overhaul Long Shutdown And Relaying Of Insulation While Unit In Service Nctps I Se Mi Circle Boiler Maintenance Division Annual Overhaul Work For The Year 25 26 Specification No 124 25 26
Gem Bids For Repair And Overhauling Service - Repair Restoration Ofmain Boiler Water Drum In Ship; Any Other Suitablebrand; No; Buyer Premises
Annual Overhauling Of Boiler Drum Safety
Supply And Erection Of Gauges And Transmitters In Fire Hydrant Mains At A Boiler Drum Floor B Bunker Top And C Near Wagon Tippler Area For Configuring The System Pressure With Dcs At Ucb For Monitoring Fire Hydrant System Pressure.
Supply, Erection, Commissioning & Replacement With Hydraulic Test And Ibr Approval Of Convection Bank Tube/drum To Drum Of Our Boiler, Gt-7014 As Per Drawing And As Per Ibr Rule And Regulation As A Turnkey Project
Gem Bids For 4 Item Code 1000106083 - Cpp3 Utility Boiler Drum West Safety Valve Psv Vent Silencer Item Code 1000106085 -cpp3 Utility Boiler Main Steam Ms Header Safety Valve Psv Vent Silencer