25 Kv Ohe Work In Connection With Conversion Of Up Dd Line At Talit Into Common Loop Under Howrah Division
Re-Organisation Of Lt Line By Prov 1 Phase Lt Line Ext. And Conversion Of Conductor Into Cablein Vill Chauki And Maseraru In Electrical Section Tikker Under Esd Lambloo. T.S- 75/2025-26. Wbs No. 32100257-001-Hmr-Lt-341. Nit 247 Re-Organisation Of Lt Line By Prov 1 Phase Lt Line Ext. And Conversion Of Conductor Into Cablein Vill Chauki And Maseraru In Electrical Section Tikker Under Esd Lambloo. T.S- 75/2025-26. Wbs No. 32100257-001-Hmr-Lt-341.
Electrical Work In C/w Provision Of New Hot Standby Ei Architecture At 09 Stations Of Sog-hmh-sgnr Section, Construction Of Ofc Room With Toilet Facility At Tibi & Jaitsar Station, Provision Of Ro Plant With 225 Kl Rcc Oh Tank & 40kl Cap Ug Tank At Sgnr And Replacement Of Old Corroded Pipe Line For Drinking Water Supply At Khinania & Nohar Railway Colony And Conversion Of Non-running Line No. 4 Into Running Line At Mandi Dabwali, Provision Of New Booking Office, Waiting Hall, Waiting Room, Circulating Area With Separate Gate And Extn Of Pf Shelter By 6 Bays At Pilibanga And Allied Infrastructure Development For The Cnc Tandem Under Floor Wheel Lathe Provision At Sgnr Depot Over Bikaner Division
Conversion Of Lt Overhead Line To Lt Underground From Iti College To Panchavti Agra Road And Dasera Maidan To Chatrapati Shivaji Maharaj Smarak, Manohar Theater, Malegaon Road, Dhule Dhule/Dmc/ Ld/ Dalitettar Fund 2025-26/ 88/1-1/ 2025-26 Conversion Of Lt Overhead Line To Lt Underground From Iti College To Panchavti Agra Road And Dasera Maidan To Chatrapati Shivaji Maharaj Smarak, Manohar Theater, Malegaon Road, Dhule
Estimate For Conversion 33 Kv Line Conductor Bare To Covered 0.5 Km Line Root Lenght On 33 Kv Stone Park Feeder Motijheel Zone
Conversion Of Lt Oh Line Distribution System Into Under Ground Cable System Of F-2 Section, F-9 Section, F-11 Section And F-12 Section Inside Factory At Ofk.
Estimate For 11 Kv Line Conversion Conductor Bare To Covered 01 Km Root Length On 11 Kv Purani Chhawni No. 02 In Motijheel Zone
Stringing Of 6293 Metre 1.1 Kv Aerial Bunched Cable With Bare/Insulated Messenger Through Existing Poles Conversion Of Lt Line At Various Locations
Electrical (general) Work In Connection With "conversion Of Up Dd Line At Talit Into Common Loop".
Electrical Trd Work In Connection With "jogbani-construction Of Stabling Line, Shunting Neck And Conversion Of Loco Reversal Line Into Pf Line