Conducting Final Location Survey (fls) For (i) New Bg Railway Line Projects (appx. Length Equal To 900.00 Km), (ii) Gauge Conversion/doubling/ Third Line/ 3rd And 4th Line (appx. Length Equal To 600.00 Km.) Of Various Projects In India, Nepal And Bangladesh (iii) Preliminary Engineering Cum Traffic Survey From Gangtok To Nathula (appx. Length Equal To 240.00 Km) In The State Sikkim With Geo-technical Investigation. Preparing Firr/eirr, Epc Document And Submission Of Dpr Etc. As Per Railway Board's Latest Guide Lines Complete In All Respect
Conversion Of Jharekhapur Halt Into 3 Line Crossing Station And Conversion Of Deokali Halt Into 3 Line Crossing Station With Goods Platform On Line No 3 In Stp- Mln Section (civil+p.way)
Pdpk-yard Modification For Provision Of One Additional Loop Line Beside Line No. 10 And Conversion Of Dead End Line No. 10 Into Loop Line With Both Side Entry And Exit Facility And Also Conversion Of 1 In 8.5 Cross-over Into 1 In 12 At Both End Of L.no.-6 For Coaching Fit (conversion Of 1 In 8.5 Cross-over Into 1 In 12 At Both End Of Line No.6 Of Pdpk Yard, Provision Of One Additional Loop Line Beside Line No.10 And Conversion Of Line No.10 Into Full Length Loop Line With Both Side Entry And Exit Facility At Pdpk Yard And Provision Of At).
The Conversion Overhead 110Kv Eht Line Into Under Ground Bethaniyapuram Under Utm No.106
Gem Bids For Telescopic, S F Of Y Bend, Telescopic Boom Repair, Purging Unitpneumatic Conversion, Ovcm Vaccum Line Construction 4Inch, Soap Solution Mixture, Supply And Installation Ofpusher 24 Head
25 Kv Electrification Work In Connection With Varanasi City Phase -iii (a. Provision Of 1 Running Line Csl 750 M. E. Provision Of 2 Stabling Line Csl 700 M On South Side Of Line No. 10, F. Conversion Of Line No.17 As Dock Running Line With Csl 400 M With An Engine Escape Line, H. One Party/saloon Siding 150m) In Bsb Division Of N. E. Railway.
(a) Extension Of Jamalpur Dock Line To Accommodate 12(twelve) Coach Memu Rake, (b) Proposal For Conversion Of Line No.4 Of Abhaipur Station Into Common Loop, (c) Provision Of Location Box At Both End Of The All Station Of Malda Division For Keeping Of Safety Equipments For Use During Exigency. (d) Provision Of Limited Height Subway At Km 43/2-3 On Bhle-baka Section Of Malda Division (e) Provision Of Limited Height Subway At Km 44/5-6 On Bhle-baka Section Of Malda Division
Work Of Conversion Of Existing Lt Line From Overhead Conductor To Underground Cabling In Village Panchayat Priol Veiling And Cuncolim Under Priol Constituency Sub Div Iii Div X Ponda Tender 1025-26
Tender For Prov. 1-phase Lt Line Conversion To 3-phase Lt Line For Voltage Improvement In Different Villages Tambri From Existing 100 Kva 11/0.4 Kv S/stn Jol Peerthan, 250 Kva 11/0.4 Kv Deslehra-i, 63 Kva 11/0.4 Kv S/stn Daslehra-ii, 25 Kva 11/0.4
Ohe Modification Work In Connection With "(a) Yard Remodeling Of Barharwa Station Along With Extension Line No.1 & 2 In Malda Division Of Eastern Railway, (b) Extension Of Stabling Line At Bgp End Of Shivnarayanpur Station To 750 Mts. Along With Connection To Main Line And Signalling Facility Of Malda Division Of Eastern Railway, (c) Provision Of Brake Van Siding & Engine Escape Line At Sakrigali Station, (d) Extension Of Jamalpur Dock Line To Accomodate 12 (twelve) Coach Memu Rake Of Malda Division Of Eastern Railway & (e) Conversion Of Line No. 4 Of Abhaipur Station Into Common Loop Of Malda Division".