Labour For Operation And Maintanence For Water Supply Distribution Pipe Line And Head Works At New Imptovements Scheme For Six Months Operation And Maintanence New Improvement Schemes
Providing Water Distribution Pvc Pipe Line At Periyar Nagar Main Road And Cross Streets In Ward 25
Providing Distribution Pipe Line In Wards No.55, 56, 57, 58, 59 And 61 In Zone 4, Tcmc
Construction Of Distribution Line For Patta Mala At Yetgaon Tal Kadegaon
Installation, Testing And Commissioning Of 11 Kv Line, Distribution Transformer, Lt Line And Providing School Connection With School Wiring In The Onm Circle
Restoration Of The Coagulant Dosing Pipe Line From Distribution Box To Coagulant Dosing Point Of Clarifier No 1, 2 And 5 At 100mgd Clarifier Plant, Igwtp.
Drilling Of New Vertical Borewell And Providing Well Water Distribution Pipe Line Near Sugunapuram Burial Ground In Ward No 92, South Zone
Providing Of Pumping Main Pipe Line And Distribution Line In 7.5 Hp Motor Arrangement In Periyaeri New Well To Selliyamman Kovil New Oht At Noothapur Pt
Power Supply And Electrical Arrangements-tiruchchirappalli Division -replacement Of Over Head Line Power Distribution System By Under Ground Cabling System At Various Colonies Over Tpj Division- - Works Contract
State Plan-2025-2026-Conveying And Fixing 50Mm Gi Distribution Line From Mudakkolli Glt To Koladi In Manakkad Gp.