Emergent Repair Of Nh-2e Belghoria Expressway From Km 0.000 To Km 7.363 Excluding From Km.2.900 To 4.250 Bhs In The State Of West Bengal On Item Rate Percentage Basis At The Risk And Cost Of Contractor
Operation And Maintenance Of Msps/sps And Sewer Line Along Expressway Replacement Of Unserviceable/damage Psc Pressure Pipe Line Into D.i. Pressure Pipe Line From Ips-4chainge 2.10 Km To 3.05 Km Along Lhs Of Expressway
Work Number 64 Coating From Purvanchal Expressway Service Line To Mohiuddinpur In Gram Sabha Mohiuddinpur
Construction Of 1400kl Capacity And 22 Mtr Staging Over Head Tank In Sector 18 Zone Ll In Pocket 6 And 7c Yamuna Expressway . Wc-01
Package 1a:- Fabrication & Erection Of Open Web/ Any Steel Truss Girder For Rob - 1 From Km 2+730 To Km 2+841. Bow String Girders For Rob-2 From Km 4+901 To Km 4+965 And Rob-3 From Km. 5+156 To Km. 5+220 For Super- Structure Including Supply And Fixing Of Expansion Joints And Excluding Construction Of Foundation, Sub- Structure And Super-structure Deck Slab For Six Lane Elevated Kona Expressway Project In The State Of West Bengal, India.
Engagement Of User Fee Collection Agency On The Basis Of Cb Through E-tender For Eight Lane Vadodara Bharuch Section Of Vadodara Mumbai Expressway From Km 844.667 To Km 936.141 On National Highway No. Ne-4 In The State Of Gujarat
Upgradation And Development Of 1 Nos. At Grade Junction To Grade Separator Underpass Flyover Structure Of Jaipur Rajasthan 200 Feet Bypass Junction Project At Km. 273.600 Delhi Jaipur Ajmer Expressway In Rajasthan On Epc Mode
R And R Of Defects And Deficiencies In The Project Stretch Eastern Peripheral Expressway Epe Ne 2 From Km. 93.000 To Km. 136.000 In Up And Hr At The Risk And Cost Of Tot Concessionaire As Per The Provisions Of Clause 15.9 Of The Ca
R And R Of Defects And Deficiencies In The Project Stretch Eastern Peripheral Expressway Epe Ne 2 From Km. 46.500 To Km. 93.000 In Up At The Risk And Cost Of Tot Concessionaire As Per The Provisions Of Clause 15.9 Of The Ca.
R And R Of Defects And Deficiencies In The Project Stretch Eastern Peripheral Expressway Ne 2 From Km 1.000 To Km 46.500 In Hr And Up At The Risk And Cost Of Tot Concessionaire As Per The Provisions Of Clause 15.9 Of The Ca