Dahod Station :- Construction Of Rcc Lift Well In Connection To Provision Of Lift 3 Nos.
Guntakal Division:- Comprehensive Maintenance Contract For 1 Nos Electrically Operated Passenger Lift At Kadapa Station Platform No 1 For 5 Years.
Provision Of 2 Nos. Of Lift At Bhaga Station Over Adra Division.
Supply, Erection, Testing And Commissioning Of Passenger Lift For Platform No.1 And 2 At Thivim Station And 3 Nos. Of Passenger Lift For Udupi Station Of Konkan Railway Under Karwar Region
Construction Of Lift Station And Its Allied Works At Dhobikaana, Lakshmipuram And Laying Of 200mm Dia Ci Pumping Main For A Length Of 1170m From Proposed Lakshmipuram Lift Station To Thiruvanmiyur Sps In Depot 179, Area Xiii
Power Supply Arrangement Work For- Sealdah Division: Provision Of 01 No. Lift At Murshidabad Station.
Camc For Rapid Loading System And Peripherals Related To Rls, Ie. Motor And Pumps Its Accessories Within Silo, Sub Station Within Silo, Lift And Air Blaster Within Silo Building, Note - Consumable Spares As Required And Breakdown Visit If Required Ar
Construction Of Lift Station And Its Allied Works At Dhobikaana, Lakshmipuram And Laying Of 200mm Dia Ci Pumping Main For A Length Of 1170m From Proposed Lakshmipuram Lift Station To Thiruvanmiyur Sps In Depot 179, Area Xiii
Repairing Of Stand By 260kw Damaged Motorcgl Make At High Lift Pumping Station Of Dariapur Wtp Within Malda Arsenic Area Water Supply Schemesouthern Sector Under Malda Mechanical Division, Phe Dte. Wbphed/ae Ii/mlmd/niet 11 Of 2025-26
Repair Of Lubrication Unit No 3 And 4 Of Lubrication System Installed At Lift Irrigation Station, Tawi Pump House Jammu.