Provision Of Limited Height Subway (lhs) With Ei (make: Hitachi) In Lieu Of Existing Manned Level Crossing No. Lc-357 At Km 661/19-21 Between Bav-mms Stations Of Kur Division And Execution Of Prime Target Works In Khurda Road Division.
Provision And Construction Of Limited Height Subways (lhs) In Lieu Of Existing Manned Level Crossings No. Ct-29 At Km 424/14-16, No. Ct-65 At Km 473/29-31, No. Jb-12 At Km 438/14-16, No. Ct-42 At Km 449/9-11 And At The Trespassing Location At Km 140/29-31 In Between Various Stations/sections Of Khurda Road (kur) Division, Including Ei Works Of Siemens Make.
Bengaluru - Sampige Road Sec : Proposed Pedestrian Subways To Facilitate Crossing Of Railway Alignment By Cattle, Pedestrians And Smaller Vehicles In Various Locations As Rcc Box Size 1x5mx2.65m In Connection With Speed Increase Upto 130 Kmph (total Number Of Subways = 11 Nos) - Fabrication Of Rh Girders. Maintenance Period Is 03 Months
Name Of The Work:-1) Telecom Arrangement In Connection With Augmentation / Upgradation Of Freight Wagon Maintenance Infrastructure Facilities At Kzj / C&w/ Depot. 2)kzj-bza Section : Upgradation Of Cops With New Sheeting( Ss Gutter,new Sheeting) & Provision Of Additional Pf Under Aden/s/kzj (kdm,nkd,gla,ygl,cle,taa,guu). 3) Kzj-bza Section :construction Of Additional Cop Under Aden/mdr Section (irs Type Cop At Ckn,bkl,yp And Bus Type Shelters At Ckn,bkl,mtmi,tngm,gnn,cvv). 4) Kzj-bza Section- Proposed Construction Of Limited Height Subway(lhs) New Bridge No. 559(a) Km 421/33-35 In Lieu Of Closed Level Crossing (tresspassing Location) At Kesamudram Station Yard As Precast Rcc Box Of Size 1x3.00x2.65m By Air Pushing Method. 5)pdpl-krmr Section: Telecom Arrangements In Connection With Four Laning Of Karimnagar-warangal Section Of Nh-563 From Design Ch.48.860 Km (near Sh-i Ch. 170.400 Km) At Manakondur Bypass To Design Ch. 116,875 Km (existing Ch. 144.050 Km) At Palvelpulla Near Hanamkonda (design Length 68.015 Km) In The State Of Telangana On Hybrid Annuity Mode Under Bhartrnala Pariyojana Construction Of Four Lane Rub At Rly.chainage Km 29/12-13 Between Peddapalli Karimnagar Stations On Peddapalli-nizamabad Section Of Secunderabad Division At Km.51,/225 On Nh563 - Shifting Of Underground Ofc Telecom Cables At Rub. 6) Kzj-bza Section - Proposed Construction Of New Bridge No. 548 (additional Vent Way) (up & On Line Portion) As Precast Rcc Box Of Size 16.00x3.oort1 At Km 418/2-4 Between Intekanne And Kesamudram Stations By Air Pushing Method Using 20.40m Rh Girder. 7) Kzj-bza Section Proposed Construction Of New Bridge No. 550a (additionalvent Way) (up & Dn Line Portion) Asprecast Rcc Box Of Size 1 X6.00x3.oom At Km 418/4-6 Between Intekanne And Kesamudram Stations By Air Pushing Method Using 20.40m Girder. -------14) Dkj-mugr: Telecom Portion For Proposed Manning Of Existing 4 Unmanned Lc Gates On Lead Line Of Ktps Siding. (14 Works)
T.no.ju/const.iii/t-03-2025-26-pss - Project Supervision Services (pss) Of Various Works Like Earthwork, Minor/major/important Bridges, Blanketing, Ballasting, Station Buildings, Platforms, Fob's, Subway, Platform Shelters, Other Buildings, S&t Structures, Staff And Passenger Amenity, All P.way Linking Works And Any Other Ancillary Works Of From New Merta City To Ras Stations (51.40 Km) And Bye Pass At Merta Road Station (4.50 Km) New Line Project On Jodhpur Division Of North-western Railway
Comprehensive Maintenance Contract Of 200Kva Generator Functioning In Pazhavanthangal Subway Alandur At Dn-162 Including Labour And Supply Of Spare Parts For A Period Of 1 Year In Zone 12, Alandur
Bengaluru - Sampige Road Section : Sw I : Proposed Construction Of Pedestrian Subway At Km 1/300-400, Size 1x5.0x2.65m, By Air Pushing Method. Sw Ii : Proposed Construction Of Pedestrian Subway At Km 45/600-700, Size 1x5.0x3.15m, By Air Pushing Method. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
Bengaluru - Sampige Road Sec : Sw I: Proposed Construction Of Limited Height Subway At Km 63/600-700, Size: 1x5.0x3.15m By Launching Method. Sw Ii: Proposed Construction Of Pedestrian Subway At Km 67/200-300 Of Size: 1x5.0x2.65m By Launching Method. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
Bengaluru - Sampige Road Sec : Sw I : Proposed Construction Of Pedestrian Subway At Km 12/900 -13/000, Size 1x5.0x2.65m, By Launching Method. Sw Ii : Proposed Construction Of Pedestrian Subway At Km 14/300-400, Size 1x5.0x2.65m, By Launching Method. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
Modification To The Existing Ohe In Connection With Provision Of Subways For Pedestrians Or Cattle Crossing For Prevention Of Trespassing Under South East Section Between Kyn-lnl Of Mumbai Division In Central Railway