Design, Construction, Furnishing And Equipping Of A Second Vertical Shaft On Turnkey Basis At Kandri Mine Of Moil Ltd. Kandri Village, Ramtek Tehsil
Concreting At 1750l Of 1st Vertical Shaft And 950l Of 2nd Vertical Shaft At Ukva Mine As Per Support And Miscellaneous Requirement
Supply And Delivery Of One Number Bare Shaft Centrifugal Pump Vertical Execution With Half Coupling Of Capacity 5600 M3/hr., 24 Metre Head For Raw Water Pumping Station, Phase-ii Of Grww. Kmc/ws/grww/t-10/2025-26
Construction Of 1.0 Lakh Litre Capacity Gsr At 1st Vertical Shaft 14/16 And 160 Feet Level At Chikla Mine.
Replacement Of Ladder Platform Fencing From 4l To 6 Level In Vertical Shaft Of Kandri Mine
Ground Water Recharging Through 10 Nos. Recharge Shaft With Vertical Filter To Be Constructed In The Submergence Of Reservoir/pond/stop Dam Of Different Villages Of Block Ghatigoan District Gwalior Recharge Shaft
Ground Water Recharging Through 07 Nos. Recharge Shaft With Vertical Filter To Be Constructed In The Submergence Of Reservoir/pond/stop Dam Of Different Villages Of Block Dabra And Ghatigaon District Gwalior Recharge Shaft
Fabrication Of Gear Set For Tub Tippler No. 1 Of 2Nd Vertical Shaft.
Design, Construction, Furnishing And Equipping Of A Second Vertical Shaft On Turnkey Basis At Kandri Mine Of Moil Ltd. Kandri Village, Ramtek Tehsil, Dist. Nagpur, Maharashtra, India .
Gem bids for Custom Bid For Services - Pushing Of Rom Tubs Up To Otcand Unloading Of Tubs Into Otc At Minus 270 Ft Level Minus370 Ft Level And Minus 470 Ft Level Ug 24 Cft Tubs, Custombid For Services - Withdrawal Of Ore From Otc At Minus 470Ft Level Of 1St And 2Nd Vertical Shaft 32 Cft Tubs, Custombid For Services - Pushing Of Loaded Rom Rock Tub Into Thecage And Empty Tub Out From Cage Of Minus 470 Ft Level Of1st And 2Nd Vertical Shaft 24 And 32 Cft Tubs, Custom Bidfor Services - Pushing And Unloading Of Rom Rock Tubsfrom Cage To Bunker And Bunker To Cage At Surface Newmaterial Handling System 1St Vs 2Nd Vs And C And S Plantbunker, Custom Bid For Services - Pushing Of Rom Tubs 24Cft For Lhd At Minus 270 Ft Level Minus 370 Ft Level Andminus 470 Ft Level And Minus 70 Ft Level Chikla B Section, Custom Bid For Services - Pushing And Unloading Of Romrock Tubs From Pit Top To Bdc Rock Dump And Empty Tubsfrom Bdc Rock Dump To Pit Top Includes Coupling Anddecoupling Of 16 And 24 Cft Tubs At Minus 70 Ft Level Inclinerope Haulage Chikla B Sect.., Custom Bid For Services -Pushing Of Rom Rock Tubs From Pit Bottom To Couplingpoint And Pushing Of Empty Tubs From Coupling Point To Pitbottom Includes Coupling And De-Coupling Of 16 And 24 Cfttubs At Minus 70 Ft Level Incline Rope Haulage, Chik.. /Bid Number: Gem/2025/B/6414578* /Dated: 04-07-2025 & & / Bid Document1 / 32 /