Facilitation Of Detailed Inspection Of Viaduct Structures Of Dmrc Operational Lines.
Shifting Of Existing Civil Utility Services Station And Viaduct Viz. Sewer Lines, Water Mains, Storm Water Drains Etc. From Chainage -0.52 Kms To Chainage 58.24 Kms
Cleaning The Carriageways, Median Verges, Footpaths Of Howrah Viaduct Main Bridge To Toll Plaza Building Both Ways Of Vidyasagar Setu For The Year 2025-2026. 2nd Call Ref- Hrbc-pmw-kr-4-25-26 Hrbc/jpmw/kr/7/25-26
Emergent Repairing Of Damaged Bituminous Surface At Up Carriageway On Howrah Viaduct Hv-26- Hv-28 Of Vidyasagar Setu. Hrbc/jpmw/kr/7/25-26
Gt Investigation And Material Survey For The Dpr For Const Of A 4-lane Major Bridge Over River Bhagirathi, Including Viaducts, Robs, Etc, Connecting Kalna Of Stkk Road And Gobindapur Of Nh 12
Providing Maintenance Services For Signalling And Train Control Systems At Stations Admin Building Occ Viaduct Tunnel Trains Depots And Other Related Premises Of Cmrl Corridor 1 And Corridor 2
Providing Maintenance Services For Signalling And Train Control Systems At Stations Admin Building Occ Viaduct Tunnel Trains Depots And Other Related Premises Of Cmrl Corridor 1 And Corridor 2.
Engineering, Design And Construction Of Viaduct Length 38.40 Kms Including 4.33 Kms Of Double Decker 4 Lane Flyover Cum Metro Viaduct 01nos. Underground Metro Station And 32 Nos Elevated Metro Stations, Etc. All As Specified On Epc Basis For Phase-1 Of Vijayawada Metro Rail, At Vijayawada Andhra Pradesh, India. Vijayawada Metro Rail Project
Construction Of Rob Of Span (1 X 63.480 M + 18 X 18.600 M + 9 X 10.00 M) With Appro Ach, (viaduct & Re Wall) Service Road And Drain In Lieu Of L.c. No.-71a On Patna- Gaya Road (ramshila More To Gaya Railway Station), Mdr, Between Station Gaya- Manpur At Rly. Km.-468/16-18
Transportation Of Metro Rail Cars And Associated Machines Or Equipnt, Including Loading Or Unloading With Insurance Coverage, From Mandale Depot To Elevated Viaduct Of Line 4 And 4a Between Gaimukh To Cadbury Metro Station And Vice Versa.