Post Monsoon Emergent Restoration Of Approach Road Of Northern Viaduct Of Bally Bridge In Patches During The Year 2025-26. Wbpwd/Ee/Hd/Niet62/2025/26
Cs For Preparation Of Dpr And Feasibility Report For Cons. Of 4l Tunnel And Viaduct 205.26 To Km 207.25 Tl Of Tunnel 1.67 Km And Viaduct 320m On Nh33 And 4l Spur Connection From Iwai Sahibganj Port To Nh33tl 2.8 Including 1 Rob In Jharkhand
Design And Construction Of Elevated Viaduct Including Ramps Of Elevated Section Of Length 7.795 Km Ror Including Design And Construction Of Double Decker Station At Mattikere And Construction Of Balance Works At Bennigenahalli Station Corridor 2 Package 1
Design And Construction Of Formation In Embankments, Cuttings Including Blanketing, Ramp, Rob, Minor Bridges, Rub, Ers/Retaining Wall, Sacrificial Retaining Wall, Drains, Boundary Wall And Fencing At-Grade Section Of 5.80 Km And Ele Viaduct Of 185M Corridor 2 Package 3
Detailed Design Consultancy Services For I Metro Corridor From Koteshwar Road Metro Station Excluding To Svp Airport Dead End, Elevated Viaduct, Elevated Station 4 Stations Including Viaduct Portion Within The Stations And Transition Spans On Either Side Of The Stations Phase -2a Ii Extension Of Metro Corridor Inside Gift City From Gift City Metro Station Dead End, Elevated Viaduct, Elevated Station 3 Stations Including Viaduct Portion Within The Stations And Transition Spans On Either Side Of The Stations Phase -2b In Connection With Ahmedabad Metro Rail Project, Phase - 2
Design And Construction Of Elevated Viaduct And Ten Elevated Stations Excl Architectural Finishing From Ch - 600 M To 11400 M Incl Spur Line Towards Depot Of Jaipur Metro Phase-Ii Mrts
Performance Based Maintenance Contracts Pbmc Work Of National Highway 10 Ch. 26.000 To 52.100 From 29Th Mile And Rangpo Viaduct In India In The State Of West Bengal In Fy 2025 26 Nhidcl/Streng./Ch 26.00 - 52.100/Nh-10/2025-26
Construction Of Proposed Rob Near Haur /station In Lieu Of Lc No. 49 1x 36 M Composite Girder, 1x60 M Bow String Steel Girder And 1x36 M Composite Girder And Approaches With Viaduct Etc.. At Km 79/17-19 Between Khirai And Haur Stations On Howrah-kharagpur Section Of South Eastern Railway At 5th Km. On Ratulia - Gobardhanpur Road Odr In The District Of Purba Mednipur.
Cs For Preparation Of Dpr For Adevelopment Of New Gf High Speed Corridor From Nanded-degloor Along With Spur Connecting To Jalna-nanded Expre.belevated Viaduct-flyover In Ausatown And Cflyover-trumpet Interchange At Waranga Phata T-junc. In Mh
Fire Evacuation Via Viaduct By Cutting Platform Slab Cast-in-situ Concrete And Widening Of Track Access Staircases And Modification In Existing Track Access Gate From R.k. Ashram To Dwarka Mor Station, Section Of Line-3.