Providing And Laying 25 Mm Thick Bituminous Concrete Along With Providing And Laying Of Hot Applied Thermoplastic Compound 2.50 Mm Thick For Edge Line In Between Km. 8/00 To 9/00 Add. Kms. Under Amp 2025-26- Village Road Annual Surfacing On Link Road To Village Khatnol Km. 0/00 To 10/000