Permanent Works Including Cutting/ Filling Of Hill With Proper Slope And Sub Bank, Construction Of Side Drain Cum Rcc Counterfort Retaining Wall On Hill Side, Construction Of Rcc Cwd And Other Misc. Works Etc At Km 108/7-9 Approach Of Bridge No.232 Between Nhlg-Jglp Of Lmg-Bpb Hill Sectiontwo Packet System.