Scr Construction Organisation- Proposed Construction Of Bye-pass Line Between Mbd & Ryp Stations Bye-passing Vijayawada Junction Connecting Bza-vskp Line & Bza-kzj Line- Left Over Balance Works & Miscellaneous Works Added Due To Extension Of Line To Ryp Yard. Works Include Formation Works Except The Location Between Ch:1300.0m To Ch: 4550.00m, Ch: 4550m To Ch: 5500m, Ch:17500m To Ch:19500m, Construction Of Lc Gate Lodge And S&t Arrangement, Compound Wall, Approach Roads, Construction Of Drain In Rayanapadu Yard, Toe Wall From Ch: 4375m To Ch: 4625m, Protective Works Of Bridges & Miscellaneous Track Works Including Supply Of Ballast Ch:0m To Ch:3000m Between Mustabada And Rayanapadu Station.