Anti-erosion Work To The Right Bank Of River Padma At Aor Of Bop Atrosia And Renu For A Total Length Of 1830.00 M In Block And P.s. Lalgola, Dist.-murshidabad Wbiw/ctu/cen/e-nit-10e/ 2025-26, Sl-01
Laying Of Underground Gas Pipeline In Nh-716 Of Tirupati To Tiruthani To Chennai Section Along The Road From Km. 61/510 To Km. 81/540 Rhs And Km. 107/600 To Km. 115/600 In The State Of Ap And From Km 45/500 To Km 61/510 Rhs In The State Of Tn
Package No. Rd-sat-a258-a Tal. Man, Dist. Satara Total 14 Work
Design , Supply , Construct , Erection And Commissioning Of Modular Structure Threw 3 D Monolithic Precast Technology For Awcera At Various Location In The Gujarat State
Construction Of Major Bridge, Minor Bridge Service Roads, Rcc Drain, Culverts And Bus Bay Between Km 367.200 To Km 450.170 Talgaon . Kalmath .Zarap Section On Nh.66 In The State Of Maharashtra On Epc Mode
Procurement Of Submersible Pump Sets To Deliver 1.75 Lps At 70 Mtr Head It 02E 2025-26
Cc Road Work For The Year 2024 2025 Sh Construction Of Cement Concrete Road Along With Drain All Around Godown Complex Left Over Portion At Fsd Avadi
Providing Tap Connections To Consumers, Extension And Augmentation Of Water Supply System At Bathinda District Bathinda For Distribution Network And Construction Of 2.0 Lakh Gallon Ohsrs Under Amrut 2.0 Scheme, Part-1
Installation Of Coal Slurry Settling Plant Cssp For Unit 1 To 6 And Dosing System For Existing Cssp Of Unit 7 And 8 Chp, Mtps
Reconstruction Of Reengus Rob Destressed Re Wall Lhs And Strengthening Of Existing Reengus Rob Rhs In Jaipur-reengus Sikar Section Of Nh 52 From Km 296.200 To 297.350 Total Length 1150m In The State Of Rajasthan On Item Rate Percentage Basis